{"id":748,"date":"2021-04-14T00:24:35","date_gmt":"2021-04-13T21:24:35","guid":{"rendered":"https:\/\/sirius-energy.com\/blog\/?p=748"},"modified":"2021-04-14T00:24:35","modified_gmt":"2021-04-13T21:24:35","slug":"capital-dynamics-to-build-200mw-indiana-solar","status":"publish","type":"post","link":"https:\/\/sirius-energy.com\/blog\/2021\/04\/14\/capital-dynamics-to-build-200mw-indiana-solar\/","title":{"rendered":"Capital Dynamics to build 200MW Indiana solar"},"content":{"rendered":"<p style=\"text-align: justify;\"><img loading=\"lazy\" decoding=\"async\" data-attachment-id=\"749\" data-permalink=\"https:\/\/sirius-energy.com\/blog\/2021\/04\/14\/capital-dynamics-to-build-200mw-indiana-solar\/generic_solar_credit_asia_chang-unsplash\/\" data-orig-file=\"https:\/\/sirius-energy.com\/blog\/wp-content\/uploads\/2021\/04\/generic_solar_credit_asia_chang-unsplash.jpeg\" data-orig-size=\"770,470\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"generic_solar_credit_asia_chang-unsplash\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/sirius-energy.com\/blog\/wp-content\/uploads\/2021\/04\/generic_solar_credit_asia_chang-unsplash.jpeg\" class=\"alignnone size-full wp-image-749\" src=\"https:\/\/sirius-energy.com\/blog\/wp-content\/uploads\/2021\/04\/generic_solar_credit_asia_chang-unsplash.jpeg\" alt=\"generic_solar_credit_asia_chang-unsplash\" width=\"770\" height=\"470\" srcset=\"https:\/\/sirius-energy.com\/blog\/wp-content\/uploads\/2021\/04\/generic_solar_credit_asia_chang-unsplash.jpeg 770w, https:\/\/sirius-energy.com\/blog\/wp-content\/uploads\/2021\/04\/generic_solar_credit_asia_chang-unsplash-300x183.jpeg 300w, https:\/\/sirius-energy.com\/blog\/wp-content\/uploads\/2021\/04\/generic_solar_credit_asia_chang-unsplash-768x469.jpeg 768w\" sizes=\"auto, (max-width: 770px) 100vw, 770px\" \/><\/p>\n<p style=\"text-align: justify;\">Capital Dynamics and Northern Indiana Public Service Company (NIPSCo), part of NiSource, have signed an agreement to bring 200MW of solar energy to the US state.<\/p>\n<p style=\"text-align: justify;\">The build-transfer agreement is for the Elliot Solar project, in Gibson County, which will begin construction in summer 2022 and begin commercial operations in summer 2023.<\/p>\n<p style=\"text-align: justify;\">Capital Dynamics will construct the project, and NIPSCO will enter into a joint venture once construction is complete.<\/p>\n<p style=\"text-align: justify;\">&#8220;We are proud to partner with Capital Dynamics on another solar energy project in our home state,&#8221; said Mike Hooper, NIPSCo president.<\/p>\n<p style=\"text-align: justify;\">&#8220;The addition of Elliot Solar to NIPSCo&#8217;s portfolio is a major step in our transition to lower-cost, cleaner and reliable energy for our customers.&#8221;<\/p>\n<p style=\"text-align: justify;\">Elliot Solar adds to NIPSCo&#8217;s two operating wind farms as well as 11 renewable energy projects previously announced as part of NiSource&#8217;s &#8220;Your Energy, Your Future&#8221; initiative, which includes the generation transition plan at NIPSCo.<\/p>\n<p style=\"text-align: justify;\">The NIPSCo projects include a combination of similar joint ventures and power purchase agreements.<\/p>\n<p style=\"text-align: justify;\">The company plans to be coal-free by 2028, adding cleaner energy sources to its existing portfolio of natural gas and hydroelectric generation.<\/p>\n<p style=\"text-align: justify;\">NIPSCo has also requested the addition of this new project to its supply portfolio in filings with the Indiana Utility Regulatory Commission.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Capital Dynamics and Northern Indiana Public Service Company (NIPSCo), part of NiSource, have signed an agreement to bring 200MW of solar energy to the US state. The build-transfer agreement is for the Elliot Solar project, in Gibson County, which will begin construction in summer 2022 and begin commercial operations in summer 2023. Capital Dynamics will [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":749,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[4],"tags":[132,130,131],"class_list":{"0":"post-748","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-clean-energy","8":"tag-elliot-solar-project","9":"tag-nipsco","10":"tag-solar-energy"},"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/sirius-energy.com\/blog\/wp-content\/uploads\/2021\/04\/generic_solar_credit_asia_chang-unsplash.jpeg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/pahFMi-c4","jetpack-related-posts":[],"_links":{"self":[{"href":"https:\/\/sirius-energy.com\/blog\/wp-json\/wp\/v2\/posts\/748","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sirius-energy.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sirius-energy.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sirius-energy.com\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/sirius-energy.com\/blog\/wp-json\/wp\/v2\/comments?post=748"}],"version-history":[{"count":1,"href":"https:\/\/sirius-energy.com\/blog\/wp-json\/wp\/v2\/posts\/748\/revisions"}],"predecessor-version":[{"id":750,"href":"https:\/\/sirius-energy.com\/blog\/wp-json\/wp\/v2\/posts\/748\/revisions\/750"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sirius-energy.com\/blog\/wp-json\/wp\/v2\/media\/749"}],"wp:attachment":[{"href":"https:\/\/sirius-energy.com\/blog\/wp-json\/wp\/v2\/media?parent=748"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sirius-energy.com\/blog\/wp-json\/wp\/v2\/categories?post=748"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sirius-energy.com\/blog\/wp-json\/wp\/v2\/tags?post=748"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}